Chapmans Peak Drive Reconstruction 2003


Description: Excavation of the half tunnel below the rock boulted roof

Description: Reverse fault in Graafwater strata exposed in the half tunnel excavation

Description: Cement spray designed to fix the broken surfaces during progressive blasting of the half tunnel

Description: Third dolerite dyke down the drive beyond the half tunnel rises from the road high into the overlying sandstone strata

First Previous  

This page was created with
ArcSoft PhotoBase
Page 3 of 3